Eiffage enhances production tracking with integrated data flows on E18 motorway project in Norway
The leading construction company connected their planning and reporting systems with Novade’s site management software
3 bridges
Total of 7.6 km tunnels
Significantly reduced paperwork
Integrated system
3 bridges
Total of 7.6 km tunnels
Significantly reduced paperwork
Integrated system
Overview
PROJECT
- E18 motorway in Norway for Nye Veier, a company owned by the Norwegian Ministry of Transport
- Design to delivery stage
- Built two Langangen bridges spanning 96 metres and 112 metres respectively as well as the Grenland bridge – a cable stayed bridge spanning 330 metres
- Construction of 10 kilometres of 2×2 lane motorway, largely underground
- Excavation of two twin-tube tunnels spanning a total of 7.6 kilometres: the Bjønnås tunnel (2.5 kilometres) and the Grenland tunnel (5.1 kilometres)
GOALS
- Reduce paperwork on site
- Implementation of a collaborative platform for BIM Level 3 where all the software is connected – right from 3D modelling, scheduling, site and document management
- Capture and analyse site data in 3D model
- Streamline operations
ISSUES
- Reduced productivity due to copious amount of paperwork
- Usage of multiple systems making it challenging to consolidate and view all data in one place
- Huge amount of time spent analysing data in different systems
CONTRACTOR
SOLUTIONS
BENEFITS
- Increased transparency and communication with key stakeholders (clients) due to better access to quality documentation
- Huge time and cost savings
- Information available across systems automatically following data capture in one system
- Enhanced visibility on project progress with real-time data available in one place
- Improved productivity and traceability
OUTCOMES
- Successful development of multiple APIs (Novade ↔ tpPLM) to exchange data (planning in Oracle Primavera P6, 3D model “QUADRI trimble”, and document management system “tpPLM”
- Site data from quality documents, inspections and test plans (ITPs), non-conformities synced to tpPLM
- Visibility on key metrics – real start and end date, volume,
Streamlined and automated site processes with digital workflows - Significant time saved with the digitalisation and optimisation of Inspection and Test Plans (ITPs) and quality documentation
- Established a better client relationship
- Easy retrieval of PDF reports to share with key stakeholders
- Systematic completion during construction phase